EU tightens building efficiency: Why intelligent lighting is now a must-have
- Press

The DESMA Group, a worldwide leading manufacturer of injection molding machines for elastomers, has decided to undertake comprehensive modernization of its hall lighting as part of its ESG strategy. The goal was to reduce energy consumption, maintenance costs, and CO₂ emissions in the long term – while maintaining the highest light quality for precise manufacturing.
The challenge was demanding: the conversion had to be carried out during ongoing production, with minimal downtime and under extreme requirements regarding light quality, reliability, and efficiency. In addition to the technical implementation, sustainability was clearly a focus. DESMA sought a solution that not only offered economic advantages but also contributed measurably to achieving the company’s own ESG goals.
welight intelligently designed and installed a modern LED lighting system with DALI LED light strips, designed for industrial continuous use and the highest precision. Coupled with DALI, the light is controlled according to demand.
The result is convincing: The new lighting provides brighter, uniformly illuminated work areas, a significant reduction in energy consumption, and improved workplace quality. welight intelligent delivered the project as a full-service package – from planning and delivery to installation and commissioning – on time and without interrupting production.
With the implementation at DESMA, welight intelligently once again demonstrates its expertise in complex industrial projects and sustainable lighting solutions that create both ecological and economic value.

